Project Overview
|
1. Project Name
|
丽江华坪硅片加工和组件制造生产线项目
Silicon
Processing and Module Manufacturing Production Line Project in Huaping
County, Lijiang
|
2. Project Industry
|
New
Material Industry
|
3. Project Site
|
Shilongba
Clean Energy Carrying Industrial Park, Huaping Industrial Park, Huaping
County
|
4. Project Overview
|
Silicon
Processing and Module Manufacturing Production Line Project in Huaping
County, Lijiang, is located in Shilongba Clean Energy Carrying Industrial
Park, Huaping Industrial Park, Huaping County, with a total investment of RMB
5 billion and a land area of 200 mu.
The project mainly constructs zones such as production, supporting
facilities, logistics and warehousing, and comprehensive service, including
production line of diamond wire slicing, highly-automated assembly production
line, power supply and distribution system, cooling water system, inert gas
supply system, vacuum system and A/C air filtration system required for the
production environment, raw materials warehouse, chemicals warehouse, office
building and R&D center. After completion, the project will turn Huaping into
a stronger PV electronic industry cluster, thus driving the local economic
development, even the development of the opto-electronics industry in China
and Southeast Asia.
|
Project Implementation Background
|
1. Industrial Policies
|
10 Measures of Lijiang to Support High-quality
Development of Private Economy
Lijiang Talent Program
Implementation Plan for "Eight Hundred"
Talent Program in Lijiang
Implementation
Opinions of People's Government of Yunnan Province on Promoting the
Development of Integrated Hydropower Silicon Material Processing and
Manufacturing Industry
Implementation
Opinions of People's Government of Lijiang City on Accelerating the
Development of Clean Energy Industry
|
2. Upper-Level Plan
|
Industrial and Informatization Development
Planning of Huaping County during the 14th Five-Year Plan
|
Project Construction Plan
|
1. Project Site Overview
|
1. Project
Site: Shilongba Clean Energy Carrying Industrial Park is located in Shilongba
Town, Huaping County, adjacent to Panzhihua, Sichuan, between Huaping-Panzhihua
Expressway and Huaping-Panzhihua Second-class Highway. It is away from
Shilongba Toll with a straight-line distance of less than 1 km and only 3.6
km away from Guanyinyan Hydropower Station, with distinctive advantages on
location, transportation and power.
2.
Shilongba Clean Energy Carrying Industrial Park is bordered by Huaping
Overlimit Transportation Management and Unloading Monitoring Point to the
north, Xinwang River to the south, Shilongba Police Station to the west and
Futian Central School to the east.
3. Land
purchasing and reserve have been done without involving "three red
lines".
|
2. Construction Duration
|
4 years
|
3. Investment Estimate
|
1. Investment Estimate: RMB 5 billion
2. Fund Raising: Self-raised by enterprises or loans
|
4. Project Content
|
1. Project Positioning:
With
Huaping Industrial Park as the carrier, the project relies on monocrystalline
silicon production of LONGi to form a PV electronic industry cluster, build a
Silicon Industry Demonstration Base of "silicon rod - wafer - cell -
processing components" in northwest Yunnan, extend the industrial chain,
increase added value and reduce logistics costs, so as to drive local
economic development, even the development of the opto-electronics industry
in China and Southeast Asia once being completed.
2. Functional Zoning:
Production
zone, supporting facilities zone, logistics and warehousing zone and
comprehensive service zone.
3. Project Content:
Production
line of diamond wire slicing: The cutting device of the diamond wire
monocrystalline silicon rods comprises the large bottom frame, portal frames,
wire arranging and mounting frames, tension motor mounting frames, tension
motors, tension arms, worktable head base, worktable tail base, wire
arranging part, wire winding and unwinding part, wire deviation detecting
part, cutter feeding units, transition guide wheels and tension guide wheels,
wherein crystal rods are clamped by the worktable head base and the workbench
tail base; and the crystal rods are controlled to rotate around axes of the
worktable head base and the worktable tail base.
Highly-automated
assembly production line: Utility model for the solar energy industry,
especially for the automated production line of monocrystalline silicon.
Supporting
facilities zone: Power supply and distribution system, cooling water system,
inert gas supply system, vacuum system and A/C air filtration system required
for the production environment.
Logistics
and warehousing zone: Raw materials warehouse and chemicals warehouse.
Comprehensive
service zone: Office building and R&D center.
|
Project Advantages
|
1. Industrial Basis
|
At present,
Xi'an LONGi, the world-leading monocrystalline silicon rod enterprise, has
in-parked in Huaping Industrial Park. The Phase I and II projects of Lijiang
LONGi (Huaping LONGi) have achieved an output of RMB 5.6 billion, with the
46,000 t of monocrystalline silicon rods in 2020; and the commencement
ceremony of the Phase III project was held on 30 March, 2021, and is under
site levelling construction. It is planned to be completed and put into
operation by the end of December, which can provide materials for the
project.
|
2. Resource Advantages
|
Mineral Resources: Huaping is rich in mineral resources with mining value, including coal, limestone, bauxite, graphite ore, dolomite, granite, etc. Huaping is one of the 200 major
coal-producing counties in China.
Power
Resources: Six large hydropower stations, namely Liyuan,
A'hai, Jinanqiao, Longkaikou, Ludila and Guanyinyan on the mainstream of
Jinsha River in Lijiang have been completed and put into operation, with a
total installed capacity of 13.76 million kW, a theoretical annual power
generation of 65 billion kWh, and an average annual power generation of 58.5
billion kWh.
Among which, Guanyinyan Hydropower
Station is located in Huaping County, with an installed capacity of 3 million
kW and an annual power generation of 12 billion kWh.
Water Resources: Huaping County belongs to Jinsha River system and has two
rivers, Xinzhuang River and Wumu River. It has one medium-sized
reservoir and 33 small reservoirs Type I and II.
Land Resources: The layout of
Huaping Industrial Park complies with "one zone, three parks", with
a total planned area of 32.13 km2, among which, Shilongba Clean
Energy Carrying Industrial Park has a planned area of 18 km2 and
is of sufficient land capacity.
|
3. Supporting Conditions
|
At present,
Shilongba Clean Energy Industrial Park of Huaping has reserved 30 GW wafer
project land in the lot adjacent to the crystal pulling workshop, and the
upstream rod pulling project can directly provide the raw materials required
for cell project. The main road that connected to Lijiang-Panzhihua
Expressway in and out of the Park has been completed and water supply and
power supply systems have been constructed in the Park. Site leveling is
finished and roads, sewage treatment plant and living supporting facilities
are complete, so the construction can be started quickly.
Power Supply: There is one 220 kV substation and two 110 kV substations in the Industrial Park, and one new 220 kV
substation and four 110 kV substations are being built for the Park's
incremental distribution network project. At the same time, one 500 kV
substation will be planned and constructed.
Water Supply: The Industrial Park is equipped with a water supply plant with a daily
water supply of 19,000 m3.
Sewage Treatment: The Industrial Park is equipped with a sewage treatment plant with a
daily treatment of 20,000 m3.
The
supporting quartz crucible Phase I has produced 30,177 quartz crucibles in
2020, reaching an output value of RMB 82.02 million.
|
4. Location and Transportation
|
Road: National Highway G353 and Provincial Highway S217 in Huaping County run
across the province.
Lijiang-Panzhihua
Expressway and Huaping-Panzhihua Second-class Highway in the Industrial Park
run across the territory.
Aviation: Huaping County enjoys a well-developed airline network and obvious
aviation advantages, with 80 km from Panzhihua Baoanying Airport, 250 km from
Lijiang Sanyi International Airport, and 360 km from Kunming Changshui
International Airport.
Railway: Panzhihua-Dali
(Lijiang) Railway, which has been included in the national railway network
plan, runs through Huaping Industrial Park. The planned freight station is 2
km away from the project site. Huaping County Clean Energy Industrial Park is
only 20 km away from Panzhihua Geliping Railway Station of Chengdu-Kunming
Railway, which can access the national railway network through Panzhihua
Geliping Railway Station.
|
5. Development Opportunities
|
With
Huaping Industrial Park as the carrier, the project relies on monocrystalline
silicon production of LONGi to form a PV electronic industry cluster, build a
Silicon Industry Demonstration Base of "silicon rod - wafer - cell -
processing components" in northwest Yunnan, extend the industrial chain, increase added value and reduce
logistics costs, so as to drive local economic development, even the
development of the opto-electronics industry in China and Southeast Asia once
being completed.
|
Factors Guarantee
|
1. Production Operation Cost
|
Electricity Price: The green hydropower with a Total installed capacity of 13.76 million kW
in Lijiang, has provided sufficient and stable energy guarantee for the
integrated development of hydropower silicon materials. The annual average
electricity price for Huaping Industrial Park Clean Energy Industry Project
is lower than the current electricity price in other regions. The electricity
price is around RMB 0.35/kWh;
Water Price: Industrial water price is RMB 3.8/m3.
Labor
Resources: Labor costs
are low in Huaping County, with the average wage of on-the-job employees in
non-private units in 2020 at RMB 4,215/month and the minimum wage in Huaping
County at RMB 1,350/month.
|
Project Policy Support
|
1. Business Environment Improvement
|
The project
has a superior marketing environment and a high degree of maturity, with the
support of government policies.
|
2. Fiscal and tax preferential policies at all levels available to
enterprises such as provincial/municipal/district/county/park investments
|
1. The
average cost of industrial land in Shilongba Clean Energy Carrying Industrial
Park (land acquisition compensation and approval fee) is RMB 164,000 per mu. If ownership is obtained through
enterprise transfer, the government will give the transfer land price the
maximum preference. At the same time, a flexible transfer mechanism of
industrial land can be adopted to minimize the cost of land for enterprises
by renting before transferring.
2.
Rent-free Settlement: For enterprises attracted from investment promotion to
lease standard workshops in Industrial Park, all leasing fees are waived for
the first three years according to the scale of the enterprise, and the
leasing fees are reduced by half for the next three years.
3. Tax
Preference: Tax preferential policies will be implemented faithfully, and
appropriate awards will be given depending on the tax contribution of
enterprises.
4. One-stop
Service: Full agent services for park settlement is implemented to create
good conditions for project construction.
5. Talent
Support: High-level management talents of enterprises attracted from
investment promotion are provided with supporting services such as household
registration, offspring schooling, spouse relocation, tourism reception,
social insurance and housing in accordance with the Green Channel Services for the Introduction of High-Level Talents in
Lijiang City.
6. Multiple
Policies Support: The enterprises attracted from investment promotion can
enjoy a series of preferential measures such as 10 Measures of Lijiang to Support High-quality Development of Private
Economy, Lijiang Talent Program and Implementation Plan for "Eight
Hundred" Talent Program in Lijiang issued by Lijiang City.
7.
Industrial Policies: Policies related to Implementation
Opinions of People's Government of Yunnan Province on Promoting the
Development of Integrated Hydropower Silicon Material Processing and
Manufacturing Industry and Implementation
Opinions of People's Government of Lijiang City on Accelerating the
Development of Clean Energy Industry are available.
|
Benefit Analysis
|
1. Operation Mode: Self-operated
2. Profit Model:
The project
is made profits from selling monocrystalline silicon wafers, solar cell
modules, secondary conduits, electronic copper foil, electronic soldering,
optical fiber materials, flat panel display materials, electronic memory and
other products.
3. Economic Benefits:
The project
investment is estimated to RMB 5 billion, covering an area of 200 mu, with a construction period of 4
years. It is estimated that the annual operating revenue is RMB 4.565
billion, the annual profit and tax is RMB 1 billion, and 2,000 employees are
employed.
|
Investment Promotion Direction
|
Beijing,
Hangzhou, Ningbo, Tianjin and Luoyang
|
Cooperation Pattern
|
Cooperation,
joint venture, and sole proprietorship
|
Contact Information
|
Contact
Authority: Investment Promotion Bureau of Huaping County
Contact
Person: Du Qinghong
Tel.:
0888—6126767
E-mail:
316381710@qq.com
|