丽江华坪年产10GW单晶硅电池片项目 Monocrystalline Silicon Cell Project with a capacity of 10 GW/year in Huaping County, Lijiang

发布时间:2021-12-31 15:19
来源:本站
作者:
点击:2595次

Project Overview

1. Project Name

丽江华坪年产10GW单晶硅电池片项目

Monocrystalline Silicon Cell Project with a capacity of 10 GW/year in Huaping County, Lijiang

2. Project Industry

New Material Industry

3. Project Site

Huaping Industrial Park, Lijiang, Yunnan (Hydropower and Silicon Integrated Demonstration Base of Yunnan)

4. Project Overview

The Monocrystalline Silicon Cell Project with a capacity of 10 GW/year, is located in Shilongba Clean Energy Carrying Industrial Park, Huaping Industrial Park, Lijiang, Yunnan. The total investment is RMB 4.25 billion, among which, the preliminary investment is RMB 3 billion. Based on the Monocrystalline Silicon Wafer and Module Project, the project, with a land area of 200 mu, processes the cell in the park after the wafers are cut, the two projects complement each other, which can not only solve the logistics costs caused by transporting to other regions, but also solve the concerns related to water abandoning and electricity oversupply in Lijiang. The project enterprises lower the production cost by utilizing the low-cost electricity abandoned, to maximize the competitive advantages and benefits of the products, realizing win-win development of interested parties.

Project Implementation Background

1. Industrial Policies

10 Measures of Lijiang to Support High-quality Development of Private Economy

Lijiang Talent Program

Implementation Plan for "Eight Hundred" Talent Program in Lijiang

Implementation Opinions of People's Government of Yunnan Province on Promoting the Development of Integrated Hydropower Silicon Material Processing and Manufacturing Industry

Implementation Opinions of People's Government of Lijiang City on Accelerating the Development of Clean Energy Industry

2. Upper-Level Plan

Industrial and Informatization Development Planning of Huaping County during the 14th Five-Year Plan

Project Construction Plan

1. Project Site Overview

1. Project Site: Yunnan Huaping Industrial Park is located in Huaping County, Lijiang, with Chengdu-Lijiang Expressway passing through. Monocrystalline Silicon Cell Project with a capacity of 10 GW/year in Huaping County, Lijiang will be established in Shilongba Clean Energy Carrying Industrial Park, which is located in Shilongba Town, Huaping County and adjacents to Panzhihua, Sichuan, between Huaping-Panzhihua Expressway and Huaping-Panzhihua Second-class Highway, less than 1 km (straight-line distance) away from Shilongba Toll and only 3.6 km away from Guanyinyan Hydropower Station.

2. Shilongba Clean Energy Carrying Industrial Park is bordered by Huaping Overlimit Transportation Management and Unloading Monitoring Point to the north, Chahe River to the south, Huaping Shilongba Middle School to the west and Niupengzi to the east.

3. Land purchasing and reserve have been done without involving "three red lines".

2. Construction Duration

4 years

3. Investment Estimate

1. Investment Estimate: The project investment is estimated to be RMB 4.25 billion and the preliminary investment is RMB 3 billion.

2. Fund Raising: Self-raised by enterprises or loans.

4. Project Content

1. Project Positioning:

With the popularity of Huaping LONGi Industrial Park and the project implementation of silicon wafer processing and manufacturing in the later stage, an industrial chain of silicon wafer slicing - cell processing - processing and modules of silicon is formed. The project highlights the advantages and makes full use of resources to achieve complementarity, takes monocrystalline silicon as the pillar industry of Huaping and construct a monocrystalline silicon cells production line with an annual output of 10 GW to drive the local economic development.

2. Functional Zoning:

Silicon wafer detection zone, production zone, warehouse zone and service zone

3. Project Content:

Silicon Wafer Detection Zone: It is required that the quality must meet these super high standards, when selecting the large diameter Czochralski monocrystalline silicon wafer.

Production Zone: surface texturing - diffusion and junction - phosphorosilicate glass removing - plasma etching - producing anti-reflective coating - screen printing - rapid sintering - peripheral equipment

Warehouse Zone: Raw materials warehouse, chemicals warehouse and logistics center.

Service Zone: Office building and R&D center.

Project Advantages

1. Industrial Basis

Huaping Industrial Park was listed as one of the clean energy demonstration parks in the province by the People's Government of Yunnan Province in July 2016 and as one of the hydropower and silicon integrated demonstration bases in the province by the People's Government of Yunnan Province in January 2019. Relying on the opportunity of pilot reform of national incremental power distribution and the surplus power of the "one-reservoir and eight-cascade" large hydropower station with a total installed capacity of 27.05 million kWh in Lijiang, Huaping Industrial Park takes initiative to undertake the industrial transfer in the mid-east region and strives to develop the clean energy industry.

2. Resource Advantages

Climate Resources: Huaping County is a typical South subtropical low-hot valley climate and its temperature and rainfall vary with the altitude, with a distinct spatial distribution.

Water Resources: Huaping County belongs to Jinsha River system and has two rivers, Xinzhuang River and Wumu River. Xinzhuang River originates from the south foot of Wupingzi Mountain, Tongda Township, Huaping County, with a drainage area of 1,240 km2. It has four main tributaries. It has one medium-sized reservoir and 33 small reservoirs Type I and II.

Power Resources: The "one-reservoir and eight-cascade" large hydropower station is planned in the main stream of Jinsha River in Lijiang, with abundant power resources. Among them, Guanyinyan Hydropower Station is located in Huaping County, with an installed capacity of 3 million kW and an annual power generation of 12 billion kWh.

Land Resources: The layout of Huaping Industrial Park complies with "one zone, three parks", with a total planned area of 32.13 km2, among which, Shilongba Clean Energy Carrying Industrial Park has a planned area of 18 km2 and is of sufficient land capacity.

Mineral Resources: Huaping is rich in mineral resources with mining value, with coal, limestone, bauxite, graphite ore, dolomite, granite, etc. Huaping is one of the 200 major coal-producing counties in China.

The coal resources in Huaping County have retained reserves of 90 million tons, with prospective retained reserves of about 350 million tons; granite reserves of about 30 million m3; limestone reserves of about 1 billion tons, which are all of grade I with calcium oxide content between 50-60%; sefstromite reserves of 30 million tons.

3. Supporting Conditions

At present, Xi'an LONGI, the world's leading monocrystalline silicon rod company, has settled in the park, and a total of 12 GW monocrystalline silicon rod projects in Phase I and Phase II have been completed and put into production, while 10 GW monocrystalline silicon rod projects in Phase III will be implemented soon. The upstream bar pulling project can directly provide the raw materials required for the cell project.

Shilongba Industrial Park

Supporting facilities in Shilongba Park include: water pumping station, sewage treatment plant, innovation and entrepreneurship center, gas station, water purification plant and fuel gas station.

There is one 220 KV substation and two 110 KV substations in the industrial park, and one new 220 KV substation and four 110 KV substations are being built for the park's incremental distribution network project. At the same time, one 500 kV substation will be planned and constructed.

Peripheral supporting facilities: police duty room, clinic, public rental housing, and a photovoltaic town is planned to be built in the surrounding area later.

4. Location and Transportation

Road: Lijiang-Panzhihua Expressway and Huaping-Panzhihua Second-grade Highway run across the territory.

Airport: At present, there is no general airport in Huaping County, but Huaping County enjoys a well-developed airline network and obvious aviation advantages, with 80 km from Panzhihua Baoanying Airport, 250 km from Lijiang Sanyi International Airport, and 360 km from Kunming Changshui International Airport.

Railway: Huaping County Clean Energy Industrial Park is only 20 km away from Panzhihua Geliping Railway Station of Chengdu-Kunming Railway, which can access the national railway network through Panzhihua Geliping Railway Station. Pan-Dali (Lijiang) Railway, which has been included in the national railway network plan, runs through Huaping Industrial Park. The planned freight station is 2 km away from the project site.

5. Development Opportunities

With the popularity of Huaping LONGi Industrial Park and the project implementation of silicon wafer processing and manufacturing in the later stage, an industrial chain of silicon wafer slicing - cell processing - processing and modules of silicon is formed. The project highlights the advantages and makes full use of resources to achieve complementarity, Monocrystalline silicon is considered as the pillar industry of Huaping County, and the construction of a production line with an annual output of 10 GW monocrystalline silicon cells can drive the economic development of Huaping County.

Factors Guarantee

1. Production Operation Cost

Electricity Price: The green hydropower with a Total installed capacity of 13.76 million kW in Lijiang, has provided sufficient and stable energy guarantee for the integrated development of hydropower silicon materials. The average electricity price per year for Huaping Industrial Park Clean Energy Industrial Project is lower than the current electricity price in other areas. The electricity price is around RMB 0.35/kWh.

Water Price: Industrial water price is RMB 3.8/m3.

Labor Resources: Labor costs are low in Huaping County, with the average wage of on-the-job employees in non-private units in 2020 at RMB 4,215/month and the minimum wage in Huaping County at RMB 1,350/month.

Project Policy Support

1. Business Environment Improvement

The project has a superior marketing environment and a high degree of maturity, with the support of government policies.

2. Fiscal and tax preferential policies at all levels available to enterprises such as provincial/municipal/district/county/park investments

1. The average cost of industrial land in Shilongba Clean Energy Carrying Industrial Park (land acquisition compensation and approval fee) is RMB 164,000 per mu. If ownership is obtained through enterprise transfer, the government will give the transfer land price the maximum preference. At the same time, a flexible transfer mechanism of industrial land can be adopted to minimize the cost of land for enterprises by renting before transferring.

2. Rent-free Settlement: For enterprises attracted from investment attraction to lease standard workshops in Industrial Park, all leasing fees are waived for the first three years according to the scale of the enterprise, and the leasing fees are reduced by half for the next three years.

3. Tax Preference: The implementation of tax incentives will be implemented faithfully, and appropriate awards will be given depending on the tax contribution of enterprises.

4. One-stop Service: Full agent services for park settlement is implemented to create good conditions for project construction.

5. Talent Support: High-level management talents of enterprises attracted from investment attraction are provided with supporting services such as household registration, offspring schooling, spouse relocation, tourism reception, social insurance and housing in accordance with the Green Channel Services for the Introduction of High-Level Talents in Lijiang City.

6. Multiple Policies Support: The enterprises attracted from investment attraction can enjoy a series of preferential measures such as 10 Measures of Lijiang to Support High-quality Development of Private Economy, Lijiang Talent Program and Implementation Plan for "Eight Hundred" Talent Program in Lijiang.

7. Industrial Policies: Enjoy the policies related to Implementation Opinions of People's Government of Yunnan Province on Promoting the Development of Integrated Hydropower Silicon Material Processing and Manufacturing Industry and Implementation Opinions of People's Government of Lijiang City on Accelerating the Development of Clean Energy Industry.

Benefit Analysis

1. Operation Mode: Self-operated.

2. Profit Model: The project makes profits through selling monocrystalline silicon cells.

3. Economic Benefits: The investment estimate of the project is RMB 4.25 billion, with an initial investment of RMB 3 billion, covering an area of 200 mu, and a construction period of 2 years; after the completion of the monocrystalline silicon cells with 10GW annual output, the annual operating revenue is expected to be RMB 10.6 billion, and the annual taxation of profit is RMB 1.6 billion. The estimated annual revenue of the solar project is RMB 3.8 billion and the annual taxation of profit is RMB 300 million. The estimated annual revenue of semiconductor fiber project is RMB 4.5 billion and the annual taxation of profit is RMB 400 million.

Investment Promotion Direction

Shenzhen, Luoyang, Suzhou.

Cooperation Pattern

Cooperation, joint venture and sole proprietorship.

Contact Information

Contact Authority: Investment Promotion Bureau of Huaping County

Contact Person: Du Qinghong

Tel.: 0888—6126767

E-mail: 316381710@qq.com

本站点由云南省投资促进局主办
版权所有 © 云南省投资促进局 未经同意不得转载

滇公网安备 53011102001196号

联系方式
0871-67195654
ynstzcjj@yn.gov.cn

云南招商官方微信

法治在线官方微信

国务院“互联网+督查”

营商环境投诉举报

营商环境问卷调查

管理员登录
平台入口